LAMINA TESTS

WATER VAPOUR PERMEABILITY
5.2.3.2 Water vapour permeability of the lamina at its maximum thickness when tested in accordance with ASTM E96-92 met the requirements noted.
Test Conducted Test Requirement Results Pass/Fail
ASTM E96-92 Minimum 170ng/pa.s.m² 221ng/pa.s.m² Pass

BONDING OF LAMINA TO INSULATION (CCMC 6.4)
Test Condition (Base & Finish Coat) Test Requirement Results Pass/Fail
Dry states N/A >0.26MPa Pass*
2 hours after removal from water >0.1 MPa >0.26MPa Pass*
After drying 7 days from removal from water >0.1 MPa >0.26 MPa Pass*
*Note all samples failed due to tensile failure of the foam.

IMPERMEABILITY TO WATER (CCMC 6.6)
5.2.3.3 Impermeability to water when tested in accordance with Section 6.6 of the CCMC Technical Guide 07240 met the requirements noted.
Test Conducted Test Requirement Results Pass/Fail
Basecoat only Min. time for entire surface to be damp - 2 hrs No dampness after 8 hrs Pass
Finish & basecoat Min. time for entire surface to be damp - 2 hrs No dampness after 8 hrs Pass