WPB (WATER PENETRATION BARRIER)
EIF RAINSCREEN SYSTEM


DESCRIPTION: Note: The water penetration barrier is a coating installed continuously over the substrate and around penetrations and openings to provide, along with other built-in features, the second line of defence against water infiltration reaching the structure.

"Preswitt Water Penetration Barrier" is a weather resistant, polymer based, non-cementitious coating. This membrane acts as a primary water-resistant and air barrier ready to receive an EIFS System. The coating is flexible and vapour permeable.

Gaps between sheathing boards shall not exceed 1.5mm.

STORAGE: Store product in a cool place out of direct sunlight and protected from the elements. Maintain temperatures above 5°C (40°F).

ACCEPTABLE SUBSTRATES:

- Masonry/concrete
- Cementitous panels
- Glass-mat gypsum sheathing over wood or steel frame
- Sound dry plywood

COVERAGE:

Porous block 500 +/- sq.ft. / 20 litres
Smooth surface 1,000 +/- sq.ft. / 20 litres

Note: variation in spreading rate, (or coverage), are due to the different porosities of different surfaces. To obtain best protective properties, maintain a 10 - 20 mil total dry film thickness, (after two coats).

CLEAN-UP: Warm soapy water.

APPLICATION: Surface temperature should be above 7°C. and air temperature should be between 10°C and 30°C. Surface must be fully cured and dry. Do not apply if rain or dew is expected within 6 hours. All loose materials, oils, tar, greases, dirt or other contaminants must be removed. Efflorescence should be removed by chemical or mechanical methods. Cracks larger than 1/16" or missing mortar should be filled with a latex or acrylic, (non-silicone), compound and allowed to dry. Joints in sheathing boards must be coated with a joint compound reinforced with glass-fibre mesh before applying WPB. Spreading rates should be used to gauge film thickness during application. WPB should not be over-spread as this will reduce the filling and protective properties. WPB should not be applied in thicknesses greater than the recommended as this may retard the curing and film formation. When using rollers for application, avoid over-rolling as this will develop foam in the film that may not leave prior to setting. Do not apply in direct sunlight.

METHOD:

Brush
Polyester / Nylon type use as supplied
Roller
20-30 mm pile use as supplied
Spray*
026 or larger tip use as supplied

*Piston displacement type pump is recommended. When using spray equipment, it is best to use large diameter hoses and a non-restrictive gun.


TECHNICAL DATA:

Test Method Result
Accelerated
Weathering
(1-GP-71)
meth. 122.13
1,000 hrs
No effect
     
Fungus Resistance (ASTM) D3273/D3274 28 days, 0 growth
     
Permeability (ASTM) E-96 proc.b 8.6 perms
     
Wind Driven Rain (Fed. 141) ttc-555b
Par 4.4.
7 0 weight gain
     
* Tensile Strength (ASTM) D2370 360 psi
     
* Elongation (ASTM) D2370 245%
     
* Recovery % 1 hour
24 hour
88%
90%
     
Solids by wt.   56.88%
     
Solids by vol.   47.6%
     
Gloss 60 deg.   6-8 units
     
Sheen 85 deg.   12-17 units

*Note: dry film thickness 20 mils. 28 days air dry at 22°C.